TTN

Doha Oasis

Share  

Project Type: Mixed development/ leisure and entertainment                      
Estimated Completion: November 2018     
Estimated Value:
$ 822 million               
Estimated Area:
460,000 sq m Area                  
Status: Under execution                                  
Location:
Al Musheireb, Doha, Qatar                           

PROJECT DETAILS

Halul Real Estate Investment Company has started construction work on its Doha Oasis mixed use development in Al Musheireb, Doha, Qatar. The project is expected to be completed by November 2018.

The mixed-use podium will comprise housing, retail, a food court, cinemas, a large mall of three storeys and cafes as well as one of the largest indoor amusement theme parks that will occupy the central area of the podium and will accommodate 26 or more different rides and attractions.

The project will also include a high-end residential building, 14 nine-storey buildings, which feature penthouses and 245 apartments.

The final component of the project is a seven-star hotel, which will have 28 floors, six restaurants, a gym, indoor pool and business centre.

A primary sub-station is to be constructed on the project site.

The buildings contain musharrabiyya-like perforated boxes obstructing the sunrays and creating an interesting architectural feature on the elevations that reflect some of Qatar’s traditional material and character.  The project is landscaped with cobbled paths, lush plants and thick trees, and provides shaded areas allowing for various activities.

Nabil Gholam Architects is the architect; the JV of AKT II and Bureau D'etutes Rodolphe Matar is the structural design consultant; Design Engineering Partners is the MEP design and infrastructure consultant; and Projacs is the PMC.

SCOPE OF WORK

Construction of mixed use development over a total area of 460,000 sq m, including: 

- A 28-floor seven-star hotel and residential buildings on an area of 256,000 sq m 
- Basements parking and services over an area 205,000 sq m 
- An 80,000 sq m landscaped area 
- A three-storey mall 
- A theme attraction park
- Cafes and restaurants
- Cinemas
- A primary sub-station

COMPANIES & PROJECT PERSONNEL

*Owner: Halul Real Estate Investment Company
Address:
P O Box 24336, Haluk, Qatar, Doha
Tel: +974 4448-32491

* Design (Structural Design) Consultant: JV of AKT II and Bureau D'etutes Rodolphe Matar

AKT II
Address:
Regus Al Bateen Business Center C6 Building, 1st Floor, 34 Street, Bainunah, PO Box 113100, Abu Dhabi, United Arab Emirates
Tel: +971 2-406-9855
Website: www.akt-uk.com

Bureau D'etutes Rodolphe Matar
Address:
CIS Building - 3rd Floor Main StreetJal El Dib, Mount Lebanon 70-1035Lebanon
Tel: +961 4-416312
Email: info@rodolphematar.com
Website: https://www.rodolphemattar.com

* Sub-Contractor (Infrastructure – Excavation): Al Tanveer International Trading and Contracting Company
Address:
P O Box 30835, Qatar, Doha
Tel: +974 4431-1403
Fax: +974 4437-3277
Email: info@altanveer.com
Website: www.altanveer.com

* Infrastructure Contractor (Shoring/ Piling/ Enabling/ Excavation): Ammico Contracting Co. .
Address:
PO Box14330 Doha, Qatar
Tel.: +974 4488 6531
Fax: +974 4488 6507                                     
E-mail: qatar@ammico.biz

*PMC Consultant: Projacs International
Address:
Barsha Boutique Office Building, 2nd Floor, 329th Street, PO Box 31155, Dubai, United Arab Emirates
Tel: +971 4-457-2445
Fax: +971 4-457-2446
Email: dubai@projacs.com
Website: www.projacs.com

Contact Name: Oussama Abdo
Position: Project Manager
Tel: +974 4431-6394 ext: 212

*Architect Consultant: Nabil Gholam Architecture & Planning
Address:
Beydoun Building, 5th floor, 15 nasra street, Achrafieh, Beirut 20625303, Lebanon
Tel: +961 1-219037
Fax: +961 1-207182
Website: www.nabilgholam.com

*MEP / Infrastructure Design Consultant: DEP Partners
Address:
Saad Ajlan Center Building, 2nd Floor, PO Box 126384, Jeddah, Saudi Arabia
Tel: +966 12-616-5541
Fax: +966 12-616-5546
Website: www.deppartners.com

*Construction Contractor: Redco Construction - Al Mana
Address:
PO Box 23300, Qatar, Doha
Tel: +974 4469-0276

TIMELINE
November 2014 - Mobilisation works started.

November 2014 - Enabling works completed.

October 201 - Main contract (including MEP) awarded to Redco Construction.

December 2013 - Excavation works completed.

Q4 2013 - Enabling, shoring, excavation and piling works contract awarded to Ammico Contracting Company and excavation works sub-contract was awarded to Al Tanveer International Trading and Contracting Company.

January 2013 - Excavation and enabling works started.

2011 - Architectural services consultancy contract was awarded to Nabil Gholam Architects and the MEP design and infrastructure consultancy contract was awarded to Design Engineering Partners.

Spacer